NEWMAN — CALIFORNIA58 LOCAL. Newman City Council approved a list of road projects for fiscal 2026–27 using state Senate Bill 1 maintenance funding. The June 9 decision identifies corridors for pavement preservation and improvements based on the city’s road-condition management system.
What residents should know
The project list includes Fresno, Tulare and Mariposa streets between State Route 33 and T Street, Stanislaus Street between Main Street and Inyo Avenue, and crack sealing, slurry sealing and striping in Steven’s Ranch, Lucas Ranch II and other locations.
The city anticipated approximately $348,580 in road maintenance revenue from SB 1 for the period. That amount represents a projected funding source, not a final verified cost for every street listed.
Maintenance treatments depend on the condition of the pavement: preserving a road in fair condition may be cheaper than waiting for a structural rebuild. Proposed work still depends on contracts, construction staging and future appropriations.
This planning story is separate from Newman’s ongoing 2026 Measure L reconstruction schedule. Residents should check notices for the specific program affecting their street rather than assume every listed corridor is closed or complete.
Source: City of Newman announcement or published council report. Check current agency records for final project and hiring status.
Support Newman News
Choose how to support Newman News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Newman News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Newman News
- Thanksgiving in Newman: A short outing to Sherman Park →
- Newman’s Seasonal Leaf and Brush Pickup Begins in November and Runs Through March 31 →
- Newman Reviews Long-Range Water Plan and Drought Response Policies Through 2050 →
- Newman Recruiting Public Works Superintendent to Oversee Water, Sewer and Street Operations →
- Newman Plans Road Reconstruction Through December 10: L Street, M Street, Tulare and Fresno Impacts →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.